DesignationISO/IEC FDIS 27014
Stage50.60, FDIS ballot closed
Planning date, an estimate15 Feb 2027
Edition in force todayISO/IEC 27014:2020
The revision

What the record shows, and what it does not

A revision page is only useful if it separates the public record from the guess. This one does. The ISO page records the stage, the edition, the page count and an abstract. It does not record the clause changes, because the draft text is not public. The clause record on this site is the published edition, not a claim about an unseen change.

QuestionAnswerBasis
Is the edition 3 text published?No. The draft is sold by ISO and the public page carries the record.ISO page 94270
What is the edition in force?ISO/IEC 27014:2020, second edition, with a corrected version from April 2022.ISO page 74046
Is the abstract different?No. The public abstract describes the same four processes and the same three audiences on both pages.ISO pages 94270 and 74046
Is the page count different?No. Both pages record 13 pages.ISO pages 94270 and 74046
Are the clause numbers the same?Not stated. The site uses the 2020 clause numbers and does not claim an edition 3 renumbering.The public record is silent
Is there a publication date?No. The planning date is an estimate for this site.ISO page; this record
Can I be certified?No. ISO/IEC 27014 is guidance and has no certification scheme.Clause 1, the scope
The honest limit. This site has not seen the edition 3 text. It will not invent a change, a clause or a date to fill the gap. When the FDIS or the published standard is available, the record is refreshed and the watch emails the diff.
WHAT TO DO

Prepare against the published edition

Build the plan
  1. Read the clause register. It is the published edition, in our words, with the evidence a board or an auditor asks for.
  2. Check the scope. The free check tells you which clause path applies and which step is weakest.
  3. Build the record. The role map, the six objectives, the four processes and the board reporting are the work that survives a change of edition.
  4. Watch the dates. The watch emails when the ISO record or the baseline changes, with a diff.
THE RULES THIS IS BUILT FROM

Read from the real rules, not invented

Every clause answer on this site points to the official rule behind it, so you can check any line yourself. The register holds 28 records, 110 evidence lines and 84 common failure lines. The dates come from the ISO record. The substance comes from the published 2020 edition, which is the baseline that edition 3 replaces.

25 CLAUSES

One page per clause

The duty in our words, the evidence a board or an auditor asks for, the common gaps and what to do before publication.

Open the register
3 ANNEXES

Guidance, clearly labelled

Annexes A to C are informative. Each page says so, because a finding cannot rest on guidance alone.

Open the annexes
ONE STAGE RECORD

No invented date

Stage 50.60 is recorded on 12 August 2026. The planning date is an estimate and is labelled wherever it appears.